THE HALFAX HEIMDALL AUGUR

2026-07-10 06:24:24 UTC
read story evidence & references

eThekwini Metropolitan Municipality continuing with water infrastructure projects

allafricainfrastructurenews.co.za · 2 blocs · 19d ago

The eThekwini Metropolitan Municipality is continuing with multi-billion-rand water infrastructure projects to improve water security and service delivery. The Lower uMkhomazi Bulk Water Supply Scheme Phase 2 costs R11 billion and has entered its second phase, according to infrastructurenews.co.za. Upon completion, the scheme will produce 100 megalitres of water per day, with 75 megalitres per day

The eThekwini Metropolitan Municipality is continuing with multi-billion-rand water infrastructure projects to improve water security and service delivery across the city. The Lower uMkhomazi Bulk Water Supply Scheme Phase 2 costs R11 billion and has entered its second phase, according to infrastructurenews.co.za. Upon completion, the scheme will produce 100 megalitres of water per day, with 75 megalitres per day allocated to eThekwini Municipality, according to infrastructurenews.co.za. The 75 megalitres per day will meet demand in the southern areas, from Isipingo to uMkhomazi, according to infrastructurenews.co.za. Water currently supplied to these southern areas will be redirected to central, northern and outer western regions to improve supply stability, according to infrastructurenews.co.za. Mayor Cyril Xaba made statements about the progress of the scheme during a media roundtable on Thursday, according to infrastructurenews.co.za.

This account was written only from facts that survived Augur's corroboration pass — 1 corroborated across opposed news blocs, 0 contested (attributed to both sides), 6 single-source (attributed). Nothing was added; no significance was inferred. Model Qwen3-Next-80B-A3B-Instruct. See the evidence & the verbatim quotes →