THE HALFAX HEIMDALL AUGUR

2026-07-10 04:14:29 UTC

← all entities

Bihar residents org

first seen 26d ago · last seen 7d ago · 3 mentions · 1 clusters · 1 corroborations

Corroborated stories featuring this entity · 1

3 corroborated · 19d ago · cluster ↗ · bhashatimes.combusinesstoday.incnbctv18.comjagran.comtimesofindia · 5 events

A rail overbridge in Buxar district, Bihar, built at a cost of ₹26.40 crore, was opened to the public and suffered a partial structural failure within four days, with a slab resting on the fifth pillar sinking.

A rail overbridge in Buxar district, Bihar, built at a cost of ₹26.40 crore, was opened to the public and suffered a partial structural failure within four days, with a slab resting on the fifth pillar sinking.
indiaother
The Buxar–Baruna rail overbridge was awaited by residents for nearly 11 to 12 years before being opened.
indiaother